Project information

  • Category: Hydro
  • Client: Phongsabthavy road and bridge construction Co., Ltd., Laos PDR.
  • Commercial date: July, 2019
  • Install Capacity: 2x6.5 MW Vertical Pelton Turbine

Site condition;

The Project is located in Xaysomboun, Laos, PDR. with turbine output each unit 6.5MW. The offered is complete of Main Inlet Valve, Hydraulic Pressure Unit, 5-jets Vertical Turbine, Synchronous generator with brushless excitation unit.

The balance of plant system complete with drainage system, power house crane, automation and SCADA system, MV switchgear, transformer, 115kV substation and protection system.