Project information

  • Category: Biomass
  • Client: Satuek Biomass Power Plant, Buriram, Thailand.
  • Commercial date: January, 2016
  • Install Capacity: 7.5 MW Steam Turbine Generator

Site condition;

The Project is located in Buriram, Thailand. with turbine output each unit 7.5MW. The offered is complete of revamp biomass boilor, combustion system, ash handling, pressure part and combustion air system, exhaust stack, Multicyclone system, steam turbine, generator, gearbox, steam condensor, coooling tower, electrical system and fule feeding unit.

The balance of plant system complete replacement and revamp the feed water system, automation, DCS and SCADA system, MV switchgear, transformer and protection system.